How to use this topsoil calculator
Estimate topsoil cubic yards, bags, delivery, compaction, labor, and project cost.
Formula
Cubic yards = length × width × depth ÷ 12 ÷ 27. Multiply by 1 + settlement/waste %, then convert to full bags or supplier increments.Worked example
Example: A 25 × 20 ft area topped with 2 in of soil needs about 3.09 cu yd before settlement. A 15% allowance raises that to about 3.55 cu yd.
Accuracy and limitations
Soil settles differently depending on composition, moisture, and compaction. Finished grades may require a site survey or multiple depth measurements.